 Fusion-Crete Animation  Fusion-Crete, Inc. Dedicated to a Better Infrastructure Fusion-Crete, Inc. Dedicated to a Better Infrastructure Fusion-Crete, Inc. Dedicated to a Better Infrastructure Fusion-Crete, Inc. Dedicated to a Better Infrastructure Fusion-Crete, Inc. Dedicated to a Better Infrastructure
 Home
 Products
 Examples
 Suppliers
 Contact/Request Info
Real-World Experiences with Fusion-CreteŽ

Severely Damaged Radius Curb with
Cracks in Sidewalk and Spandrel

BACK TO PHOTO EXAMPLES MAIN PAGE
(click on thumbnails for enlarged photos)

Sequence2No1.jpg (82917 bytes)

Here is a severely damaged radius curb with cracks in the sidewalk and spandrel.

Sequence2No2.jpg (87844 bytes)

Prior to commencement of the repairs, the loose pieces and smaller debris seen here will be removed.

Sequence2No3.jpg (73546 bytes)

Here you see the loose pieces removed and the area cleared of other small pieces of loose rocks, gravel, etc.

Sequence2No4.jpg (97066 bytes)

Following surface preparation and priming with FUSION-CRETEŽ products, a piece of bender-board is used temporarily to form the radius and to contain the repair material which has been mixed to a dry consistency in the wheelbarrow.
Sequence2No5.jpg (94850 bytes) As the radius curb repairs continue with the relocated bender-board, cracks and other damaged areas are also repaired.
Sequence2No6.jpg (84114 bytes) The bender-board is removed immediately following the placement and compaction of the repair material, exposing the repaired areas.  Work on crack-repairs continues.
Sequence2No7.jpg (58289 bytes) Once the repair work has been completed, a thin, flexible, fully load-bearing FUSION-CRETEŽ coating application is applied in order to camouflage the repairs and to renew and protect the exposed surfaces.
Sequence2No8.jpg (104298 bytes) Here you see the area beautifully repaired and coated with FUSION-CRETEŽ products.  The barricades will be removed in approximately 24 hours. 
 Estimated time for completion of this project: 5 ˝ hours.